![]() ![]() If the difference is negative the wind farm owner pays the difference to the government.Ī vessel used to transport wind farm technicians and other personnel to the offshore wind farm turbines either from port or from a fixed or floating base. ![]() Spend on all activities up until works completion date.Ĭontract where government agrees to pay the wind farm owner the difference between an agreed strike price and the average market price of electricity (reference price). Ratio of annual energy production to maximum energy production if the turbine / wind farm ran at rated power all year. Systems include bend restrictors and bend stiffeners where the cable may be subject to increased loading. Government department that is responsible for business, industrial strategy, science and innovation and energy and climate change policy.Ĭable protection systems protect the subsea cable against various external aggressions. Includes all the components of the wind farm except the turbines, including transmission assets built as a direct result of the wind farm.ĭepartment for Business, Energy and Industrial Strategy (BEIS) The percentage of time the assets are available to produce / transfer power if the wind speed is within the operational range of the turbine. ![]() Net AEP is the metered annual energy production at the offshore substation, so includes wind farm downtime, wake, electrical and other losses.Įlectrical cable that connects the turbines to each other and the offshore substation. Gross AEP is the predicted annual energy production based on the turbine power curve, excluding losses. The amount of energy generated in a year. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |